Life Cycle Cost Analysis Example 01

Operation and Component Calculation View

Components NPV Calculator

Introduction
This tool calculates net present value totals for operation and component uris. The discounted totals include operating, allocated overhead, capital, and incentive-adjusted totals. Operations or components that have an effective life different than 1 period include annual totals. Resource stock analyzers use the scheduling and timeliness parameters for labor and capital stock planning.

Calculation View Description
Sample analysis used in a DevTreks tutorial. v210a

Version: 1.7.0

Feedback About commercial/componentgroup/Life Cycle Cost Analysis Example 01/657/component

Step 1 of 3. Make Selections


Step 2 of 3. Calculate

Relations

Use In Childs?
Overwrite Childs?

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.



Instructions (beta)

Step 1

  • Step 1. Real and Nominal Rates: The nominal rate includes inflation while the real rate does not. In the USA, DevTreks recommends using Office of Management and Budget rates for the same year as the date of the input.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 3. Overwrite Descendants?: True to insert or update all of the attributes of this same calculator in all children. False only updates children attributes that are controlled by the developer of this calculator (i.e. version, stylehsheet name, relatedcalculatorstype ...)
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Related Calculators Type: When the Use Same Calculator Pack in Descendant is true, uses this value to determine which descendant calculator to update. Inserts a new descendant when no descendant has this same name. Updates the descendant that has this same name.
  • Step 2. Alternative Type: This property is used to analyze differences between Alternatives.
  • Step 2. Target Type: This property is used to analyze progress being achieved with budget goals.
  • Step 2. Calculated Results: Please refer to the references below.

References

  • Hallam, Eidman, Morehart and Klonsky (editors) Commodity Cost and Returns Estimation Handbook, Staff General Research Papers, Iowa State University, Department of Economics, 1999

Current view of document
Life Cycle Cost Analysis Example 01
Component Group : Life Cycle Cost Analysis Example 01
Document Status : notreviewed
Description : This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress component analyzers.
Label : A10 Component Type : 0
Is Price List? : False
Component
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
2007 Example 01 Slab on Grade (8/20/2013 12:00:00 AM)
12/31/2007 A10301A none 1 1 0.0000 0.0000 0
Component Unit:each ResourceWeight 0 Rates (R and N) 0.0100  0.0300
Description This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress component analyzers.
Total Costs - Component Total Cost Annual Cost Interest Portion
Total Operating Costs 0.00 0.00 0.00
Total Allocated Overhead Costs 0.00 0.00 0.00
Total Capital Costs 58,650.13 58,650.13 1,683.13
Total Costs - Component 58,650.13 58,650.13 1,683.13
Total Costs - Component w. Incentives 58,650.13 58,650.13
Inputs
Component
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
2007 Example 02 Slab on Grade (8/20/2013 12:00:00 AM)
12/31/2007 A10301B none 1 1 0.0000 0.0000 0
Component Unit:each ResourceWeight 0 Rates (R and N) 0.0100  0.0300
Description This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress component analyzers.
Total Costs - Component Total Cost Annual Cost Interest Portion
Total Operating Costs 0.00 0.00 0.00
Total Allocated Overhead Costs 0.00 0.00 0.00
Total Capital Costs 37,320.93 37,320.93 1,070.23
Total Costs - Component 37,320.93 37,320.93 1,070.23
Total Costs - Component w. Incentives 37,320.93 37,320.93
Inputs
Component
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
2008 Example 01 Slab on Grade (8/20/2013 12:00:00 AM)
12/31/2008 A10301A none 1 1 0.0000 0.0000 0
Component Unit:each ResourceWeight 0 Rates (R and N) 0.0100  0.0300
Description This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress component analyzers.
Total Costs - Component Total Cost Annual Cost Interest Portion
Total Operating Costs 0.00 0.00 0.00
Total Allocated Overhead Costs 0.00 0.00 0.00
Total Capital Costs 31,442.77 31,442.77 903.98
Total Costs - Component 31,442.77 31,442.77 903.98
Total Costs - Component w. Incentives 31,442.77 31,442.77
Inputs
Component
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
2008 Example 02 Slab on Grade (8/20/2013 12:00:00 AM)
12/31/2008 A10301B none 1 1 0.0000 0.0000 0
Component Unit:each ResourceWeight 0 Rates (R and N) 0.0100  0.0300
Description This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress component analyzers.
Total Costs - Component Total Cost Annual Cost Interest Portion
Total Operating Costs 0.00 0.00 0.00
Total Allocated Overhead Costs 0.00 0.00 0.00
Total Capital Costs 34,893.83 34,893.83 1,003.47
Total Costs - Component 34,893.83 34,893.83 1,003.47
Total Costs - Component w. Incentives 34,893.83 34,893.83
Inputs
Component
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
2009 Example 01 Slab on Grade (8/20/2013 12:00:00 AM)
12/31/2009 A10301A none 1 1 0.0000 0.0000 0
Component Unit:each ResourceWeight 0 Rates (R and N) 0.0100  0.0300
Description This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress component analyzers.
Total Costs - Component Total Cost Annual Cost Interest Portion
Total Operating Costs 0.00 0.00 0.00
Total Allocated Overhead Costs 0.00 0.00 0.00
Total Capital Costs 0.00 0.00 0.00
Total Costs - Component 0.00 0.00 0.00
Total Costs - Component w. Incentives 0.00 0.00
Inputs
Component
Date Applied Label 1 Label 2 Amount Eff. Life Salv. Value Incent. Amount Incent. Rate
2009 Example 02 Slab on Grade (8/20/2013 12:00:00 AM)
12/31/2009 A10301B none 1 1 0.0000 0.0000 0
Component Unit:each ResourceWeight 0 Rates (R and N) 0.0100  0.0300
Description This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress component analyzers.
Total Costs - Component Total Cost Annual Cost Interest Portion
Total Operating Costs 0.00 0.00 0.00
Total Allocated Overhead Costs 0.00 0.00 0.00
Total Capital Costs 23,931.02 23,931.02 686.15
Total Costs - Component 23,931.02 23,931.02 686.15
Total Costs - Component w. Incentives 23,931.02 23,931.02
Inputs
Dataset: Life Cycle Cost Analysis Example 01 IRI This building construction cost estimate is computed using life cycle cycle totals, statistics, incremental change, and progress component analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.